REUSABLE LAUNCH VEHICLE TECHNOLOGY DEMONSTRATOR PROGRAM (RLV – TD)

What is this RLV-TD?

  • Reusable Launch Vehicle-Technology Demonstration Program or RLV-TD is a series of technology demonstration missions that have been considered as a first step towards realizing a Two Stage To Orbit (TSTO) fully re-usable vehicle.
  • A Winged Reusable Launch Vehicle technology Demonstrator (RLV-TD) has been configured to act as a flying test bed to evaluate various technologies, namely, hypersonic flight, autonomous landing, powered cruise flight and hypersonic flight using air-breathing propulsion
  • RLV‐TD is a winged vehicle that will take off like a rocket and glide back to land like a plane.
  • These technologies will be developed in phases through a series of experimental flights. The first in the series of experimental flights is the hypersonic flight experiment (HEX) followed by the landing experiment (LEX), return flight experiment (REX) and scramjet propulsion experiment (SPEX).

First Stage:

  • The first stage will be powered by a semi cryogenic (liquid Oxygen and Kerosene ie., ISROSENE) winged booster capable of flying back and landing on a runway near the launch site like a conventional aircraft after burnout.
  • The objective of the Semi Cryogenic Engine Development is to power the future heavy lift Unified Launch Vehicles (ULV) and Reusable Launch Vehicle (RLV) of India.
  • This semi cryogenic engine, which uses a combination of cryogenic as well as earth storable propellants, developing a thrust of 2000 kN, is planned as the booster engine for the Common Liquid Core of ULV.

 RLV‐TD is used to evaluate various characteristics like

  • Hypersonic flight
  • Autonomous landing
  • Powered cruise flight
  • Hypersonic flight using air-breathing propulsion.

ISRO has a proposed concept named Unified Launch Vehicle (ULV) sometimes referred as Unified

Benifits:

  • The cost of access to space is the major deterrent in space exploration and space utilization. A reusable launch vehicle is the unanimous solution to achieve low cost, reliable and on‐demand space access. Today by using conventional rocket it costs about $5000 to put 1 Kg of payload in orbit. RLV can do the same for $500 for per Kg of payload. India currently spends about 300 crore rupees annually for satellite launches, where RLV in future will bring down this cost 10 times.
  • Full fledged developed version of RLV can be used for manned missions in future.

What kind of tests will be carried out under RLV-TD….?

As part of this development sequence, ISRO has planned for four flight test sequence that will incrementally test the various flight characteristics as hypersonic re‐ entry, autonomous landing, powered cruise flight etc. The four flight test (4TD) sequence includes:

  1. Hypersonic Flight Experiment (HEX)
  2. Landing Experiment (LEX)
  3. Return Flight Experiment (REX)
  4. Scramjet Propulsion Experiment (SPEX)

HYPERSONIC FLIGHT EXPERIMENT (HEX)

  • This is the first test of Reusable Launch Vehicle.
  • During the mission, a booster rocket (Single strap‐on solid booster of the Polar Satellite Launch Vehicle (PSLV) with 9 tonne fuel) will take the 1.5 tonne RLV scale model to 70‐km altitude and release it.
  • The booster rocket will fall back into the sea.
  • The lofted  RLV  will  re‐enter  the  atmosphere  independently  travelling      at hypersonic speed and the descent speed would be controlled using the wings.
  • The RLV has protective tiles to dissipate frictional heat during re‐entry.
  • In the first trial‐flight, the RLV will not be recovered from sea because it will not be cost‐effective to do so. ISRO will instead use telemetry data on the re‐entry, deceleration and return.

Why this RLV – TD HEX1 landed on water and not in land….?

  • This was primarily a hypersonic flight technology demonstration mission.
  • So, the RLV – TD did not carry the capability to return to land for landing.
  • Therefore after its primary mission glide through the atmosphere, it splashed down into the Bay of Bengal.
  • Moreover to achieve the real time landing in ground we need to have a runway of about 5 Km, currently (longest runway now is about 2 Km) we don’t have such a long runway but in near future we can have such a long run way in Sriharikota.

LANDING EXPERIMENT (LEX)

  • In the second phase RLV will be tested without its scramjet engine.
  • After burnout, the booster will separate and fall away, and the RLV‐TD will go on to make an unpowered ascent.
  • The RLV‐TD will then re‐enter the atmosphere at hypersonic speed and use aerodynamic breaking to decelerate.
  • It will perform a range manoeuvres at 15‐km, a 2g turn towards its launch site.
  • Once the RLV‐TD reaches 0.8 Mach, it will light up a turbofan engine to cruise back to its launch site at 0.6 Mach and make a horizontal landing on a runway.

RETURN FLIGHT EXPERIMENT (REX)

  • In this phase, the RLV‐TD will be launched to orbit and then de‐orbited for a landing on a runway.
  • This is achieved with the help of HEX and LEX.

SCRAMJET PROPULSION EXPERIMENT (SPEX)

  • Eventually, the RLV will be powered by an air breathing scram jet which is being developed under a separate project called Air Breathing Propulsion Project (ABPP).

Related Posts
Waste Management: A goods train to transport city’s waste
Unable to enforce segregation of waste at source or run processing plants without citizens protesting, the city’s planners have hit upon a novel solution. They are planning to load the garbage ...
READ MORE
Karnataka – Revised TDR notified; to be twice property value
The state government has notified the rules for implementing the revised scheme, which envisages acquisition of land for infrastructure projects. Under the revised scheme, two times the value of the land ...
READ MORE
Karnataka Current Affairs – KAS/KPSC Exams – 24th Oct 2017
Govt. starts process to roll out Smart City plan After finally making it to the list of ‘Smart Cities’, the process to make Bengaluru ‘smart’ has begun, with the State government ...
READ MORE
Karnataka – Govt Slashes Tax On CCTV Cameras To Increase Surveillance
Closed Circuit Television (CCTV) cameras and its peripherals are all set to become cheaper with the Commercial Taxes department slashing the rate of Value Added Tax (VAT) on the products from ...
READ MORE
“27th ಏಪ್ರಿಲ್  2018 ಕನ್ನಡ ಪ್ರಚಲಿತ ವಿದ್ಯಮಾನ”
ವಾಹನದಟ್ಟಣೆ ಬೆಂಗಳೂರು ನಂ.2 ಸಂಚಾರ ದಟ್ಟಣೆ ಸಮಸ್ಯೆಯಿಂದಾಗಿ ಇಡೀ ರಾಷ್ಟ್ರಕ್ಕೆ ವಾರ್ಷಿಕ 1.5 ಲಕ್ಷ ಕೋಟಿ ರೂ. ನಷ್ಟವಾಗುತ್ತದೆ ಎಂಬುದು ಇತ್ತಿಚಿನ ಅಧ್ಯಯನ ವರದಿ ತಿಳಿಸಿದೆ. ಬೆಂಗಳೂರು ಸೇರಿ ರಾಷ್ಟ್ರದ ನಾಲ್ಕು ಪ್ರಮುಖ ನಗರಗಳಾದ ದೆಹಲಿ, ಮುಂಬೈ ಮತ್ತು ಕೋಲ್ಕತದಲ್ಲಿ ನಡೆಸಲಾದ ಅಧ್ಯಯನದಿಂದ ಈ ...
READ MORE
Karnataka Current Affairs – KAS / KPSC Exams – 26th April 2017
State wants restaurants to display service charge rule Hotels and restaurants in Karnataka will soon have to display boards saying ‘service charge’ is voluntary. They can’t add the charge in their ...
READ MORE
Karnataka: Mid-Year Review Shows State Cash Happy
Revenue surplus is Rs. 8,751 cr. in the first six months of financial year 2016-17 Karnataka has a comfortable cash position and there is no need to avail loans from the ...
READ MORE
Tumakuru, Belagavi & Dharwad districts to soon get piped gas
Piped natural gas and compressed natural gas will soon be available in Tumakuru, Belagavi and Dharwad districts. Work on the City Gas Distribution (CGD) project has already begun in these districts. Petroleum ...
READ MORE
Rural Development-Rural Energy Programmes-National Biogas Manure and Management
Rural Energy Programmes National Biogas Manure and Management Programme (NBMMP), Karnataka State Bio-fuel Policy -2009 and Soura Belaku are the three programmes implemented under Rural Energy sector. National Biogas Manure and Management Programme (NBMMP) Biogas is a clean, ...
READ MORE
Karnataka Issues: Environmental Challenges
Sustainable urban development is not a choice but a necessity. If cities are to meet the needs of their citizens (United Nations 2007). Some of the most critical problems facing our cities concern the ...
READ MORE
Waste Management: A goods train to transport city’s
Karnataka – Revised TDR notified; to be twice
Karnataka Current Affairs – KAS/KPSC Exams – 24th
Karnataka – Govt Slashes Tax On CCTV Cameras To
“27th ಏಪ್ರಿಲ್ 2018 ಕನ್ನಡ ಪ್ರಚಲಿತ ವಿದ್ಯಮಾನ”
Karnataka Current Affairs – KAS / KPSC Exams
Karnataka: Mid-Year Review Shows State Cash Happy
Tumakuru, Belagavi & Dharwad districts to soon get
Rural Development-Rural Energy Programmes-National Biogas Manure and Management
Karnataka Issues: Environmental Challenges

Leave a Reply

Your email address will not be published. Required fields are marked *