Published on: March 13, 2023
BENGALURU-MYSURU EXPRESSWAY PROJECT
BENGALURU-MYSURU EXPRESSWAY PROJECT
Why in news? Prime Minister inaugurated the Bengaluru-Mysuru expressway
BENGALURU-MYSURU EXPRESSWAY PROJECT
- Length -119 km
- Built on NH-275
- 6-10 lane access-controlled highway
- Developed by the ministry of road transport and highway
- National Highways Authority of India (NHAI) awarded the project to Dilip Buildcon
- Aiming to decongest the traffic movement between Bengaluru and Mysuru and eventually reduce the travel time from three hours to 75 minutes
- Consists of two phases:
- 58 km-long Phase 1 between Bengaluru and Nidaghatta
- 61 km-long Phase 2 between Nidaghatta and Mysore