KEN–BETWA LINK PROJECT (KBLP)

NEWS: Protests against the Ken–Betwa Link Project in Madhya Pradesh have intensified, with tribal communities demanding adequate rehabilitation and resettlement (R&R) before project implementation.

ABOUT

  • India's first major river interlinking project under the National Perspective Plan for River Interlinking (NPP).
  • Objective: Transfer surplus water from the Ken River to the water-deficit Betwa River basin.
  • Ken River: Flows mainly through Madhya Pradesh.
  • Betwa River: Flows through Madhya Pradesh and Uttar Pradesh.
  • Both are tributaries of the Yamuna River.

OBJECTIVES

  • Provide irrigation to drought-prone Bundelkhand.
  • Improve drinking water supply.
  • Support industrial development.
  • Enhance agricultural productivity and employment.

KEY FEATURES (PHASE-I)

  • Daudhan Dam (77 m) on the Ken River.
  • 221-km Ken–Betwa Canal (including a 2-km tunnel).

Power generation:

  • 103 MW Hydropower
  • 27 MW Solar Power
  • Water Utilisation: 4,543.52 MCM
  • Madhya Pradesh – 2,350 MCM
  • Uttar Pradesh – 1,700 MCM

PHASE-II

  • Construction of: Lower Orr Dam, Kotha Barrage, Bina Complex Projects

MAJOR CONCERNS

  • Submergence of nearly 6,000 hectares of the Panna Tiger Reserve.
  • Loss of tiger habitat, forests, and biodiversity.
  • Displacement of tribal communities and concerns over inadequate rehabilitation and compensation.