Published on: June 21, 2024

CHENAB BRIDGE

CHENAB BRIDGE

NEWS – Railways Conducts Trial Run on Iconic Chenab Bridge

HIGHLIGHTS

Successful Trial Run

  • Event: Trial run of an eight-coach MEMU train.
  • Trial Run: Conducted on the 46-km-long electrified line section between Sangaldan (Ramban district) and Reasi.
  • Speed: Train ran at a speed of 40 kmph

Chenab Bridge Specifications

  • Length: 1,315 meters.
  • Arch Span: 467 meters.
  • Height: 359 meters above river bed.
  • Comparison: 35 meters taller than the Eiffel Tower.

Future Rail Services

  • Impact of Trial: Paves the way for starting rail services from Reasi to Baramulla in Kashmir.
  • Project: Part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.

Historical Significance

  • First Full Train Set: Crossed over the Chenab Bridge between Dugga and Bakkal stations.
  • Previous Milestone: A 48.1-km section from Banihal to Sangaldan inaugurated by PM Modi on February 20, 2024.