Published on: June 21, 2024
CHENAB BRIDGE
CHENAB BRIDGE
NEWS – Railways Conducts Trial Run on Iconic Chenab Bridge
HIGHLIGHTS
Successful Trial Run
- Event: Trial run of an eight-coach MEMU train.
- Trial Run: Conducted on the 46-km-long electrified line section between Sangaldan (Ramban district) and Reasi.
- Speed: Train ran at a speed of 40 kmph
Chenab Bridge Specifications
- Length: 1,315 meters.
- Arch Span: 467 meters.
- Height: 359 meters above river bed.
- Comparison: 35 meters taller than the Eiffel Tower.
Future Rail Services
- Impact of Trial: Paves the way for starting rail services from Reasi to Baramulla in Kashmir.
- Project: Part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project.
Historical Significance
- First Full Train Set: Crossed over the Chenab Bridge between Dugga and Bakkal stations.
- Previous Milestone: A 48.1-km section from Banihal to Sangaldan inaugurated by PM Modi on February 20, 2024.